1) based on accuracy required ( plane survey) - curvature of earth is not considered
- area = small
-You said when are high degree of precision and accuracy is not required
⇒ plum bomb line :-
-perpendicular line to the surface of Earth line joining centre of earth
-where a curvature of earth is considered
-area =large
-plumb line interactive a centre of earth
- used where high degree of precisions is required
-line connecting 2 points is one arch and angle between them =spherical angle
-Geodic survey is considered an area more than 250 km squar
-the object of zodiac survey is 2 determine the precise position on the surface of Earth of a system of widely distance point which survey of less precision and may be referred (plane survey)
⇒which form the control point and station to which survey
-caried out by survey of India
Q-1
Geodetic survey is used for...
Answer- getting control point for horizontal control
⇒ Basic on nature of field (place)
(A) land survey:- (on the surface of Earth )
(1) topographical survey:-
-horizontal and vertical locations of certain objective by linear and angular measurement
-natural:- river ,stream, Lake ,wood ,hill etc
-artificial :-road ,railway, canal, town and village.
(2) Cadestral survey:- (border)
-to know and fix the proper line
example:-
- boundary of municipal and state
(3) City survey
-To provide any service in a city :-
-Construction of streets sewers etc
-Water supply system
(B) Hydrographic survey :-(Marine survey)
-deals with the bodies of water
-work :-determination of discharge of streams data of the depth of water in river and ocean tides
-application :- navigation, water supply for Township work determination of MSL
(C) Astronomical survey
-Determining the absolute location of any point on the surface of earth by observation to Sun or any fixed star
3) besed on object of survey :-
(A) Geological survey
-surface + sarface information
(B) Engineering survey:-
Data for designing of engineering structure
example :-elevation ,location earthwork calculations, of material calculation
(C) Military survey
Point of strategic importance.
(D) Mine survey
Exploring the mineral weadth
(E) Archaeological survey
Infor abouts ancient moment town villages temples for history and culture of past civilization
(4) based on instrument used
(A) chain survey :- (linear measurement)
Ex:- sewer line, water supply, construction of road and railway etc
(B) traverse survey :- linear + angular measurement
Ex:- dam ,reservoir ,building ,lake area etc
(C) levelling :- elevation of different point
- staff and levels are used
Ex:- preparation of contour map
(D) Tacheometey
- Horizontal and vertical distance
- indirect measurement
(E) plane table
Traversing linear and angular
(F) Triangulations
Area is divided into number of triangle
(G) electronic distance measurement device - D= v * t (sonar technic )
- distance measured by wave propagation reflector and subsequent reception
Ex:- Tellarometer distance geodimetr etc
(H) Total station:- theodolite + EDM
- all work angle horizontal distance vertical distance
(I) Satellite survey:- GPS, GIS RS etc
(J) PHOTOGRAMETRY SURVEY :-
By Ariel photograph for preparing map of large area and remote places
⇒ Principal off surveying :-
-Work from ball to part
-large measurement =majority with high degree of precision
-Small measurement = laser degree and recession
- length increase error decrease
-help in preventation of accumulations of error